Nepal's industrial corridor along the Terai — spanning Birgunj, Hetauda, and Butwal — powers the country's manufacturing backbone. Yet factories here lose an estimated 15–25% of productive capacity annually to power interruptions, voltage fluctuations, and unplanned outages. For export-oriented industries with tight delivery timelines, this is not just an inconvenience — it's a competitiveness crisis.
Krishna Garments (name changed for confidentiality), a 500-worker export garment manufacturer in Birgunj, faced three distinct power problems. First, complete outages of 2–4 hours daily required a 200 kVA diesel generator, costing NPR 180,000/month in fuel alone. Second, voltage sags when heavy motors started caused digital embroidery machines to reset, losing work-in-progress worth NPR 8,000–15,000 per incident. Third, NEA's industrial tariff included a maximum demand charge — billed on the highest 15-minute peak in each month — that was inflated by motor startup spikes.
Arsa Energy's industrial team deployed a three-tier solution addressing all three problems simultaneously. The system was designed around a 300 kWh Hithium industrial battery energy storage system (BESS) in a dedicated battery room adjacent to the main distribution board.
The project economics were evaluated over a 10-year horizon, accounting for NEA's industrial tariff structure which charges both an energy rate (NPR/kWh) and a demand rate (NPR/kVA of maximum demand). Peak shaving alone reduced the monthly demand charge by NPR 68,000.
NPR 165,000
Monthly Diesel Fuel Savings
NPR 68,000/mo
Peak Demand Charge Reduction
97%
Production Loss Reduction
4.5 years
System Payback
Stable power quality also improved worker safety — voltage sags had previously caused arc flash incidents on older wiring, and two electrical fires in three years were traced to generator surge events. Post-installation, the factory achieved ISO 50001 energy management certification, which their European buyer required as a condition for a new 3-year supply contract.
Nepal's industrial sector consumes approximately 1,200 GWh annually, with an estimated 20–30% wasted or offset by diesel generation. If even 30% of large industrial consumers adopted energy storage with peak shaving, NEA's peak demand management would improve significantly — potentially deferring the need for additional transmission infrastructure investment by several years.
💡 Arsa Energy provides industrial BESS solutions from 100 kWh to multi-MWh scale, including detailed energy audits, NEA tariff optimization analysis, and turnkey EPC delivery. Our industrial team has deployed systems in Birgunj, Hetauda, Butwal, and Dhangadhi.
Read →
Read →
Get a free consultation and site assessment from Arsa Energy's team of Nepal-based engineers.
Get Free Consultation