From a Kathmandu family eliminating load shedding to a utility stabilising Nepal's national grid β Arsa Energy designs, supplies, and commissions complete energy storage systems at every scale. One partner, any project size.
π
Frequent outages
Grid interruptions cost homes and businesses thousands every month in lost productivity, damaged equipment, and diesel fuel.
πΈ
Rising energy costs
NEA demand charges, grid dependency, and imported diesel inflate operating costs across every sector of Nepal's economy.
π§οΈ
Hydropower seasonality
Monsoon surplus goes to waste while the dry season forces expensive imports β a gap storage is uniquely positioned to close.
π
Diesel-powered agriculture
Irrigation pump sets across the Terai consume millions of litres of diesel each season, squeezing farm margins thin.
π
3 kWp solar Β· 5β20 kWh storage
Residential Challenge
Nepals Kathmandu Valley, Pokhara, and mid-hill towns still experience 4β10 hours of unplanned outages during peak season. A rooftop solar + LFP battery system eliminates generator dependency, cuts monβ¦
NPR 5β12 lakh
Typical System Cost
NPR 8,000β18,000
Monthly Savings
4β6 years
Payback Period
π’
20β500 kWh Β· up to 500 kW inverter
Commercial Challenge
Hotels, hospitals, schools, retail centres, and office complexes in Nepal face the double burden of unreliable grid supply and expensive diesel backup. A commercial BESS (Battery Energy Storage Systemβ¦
NPR 40 lakh β 2 crore
Typical System Cost
NPR 80,000β3,00,000
Monthly Savings
3β5 years
Payback Period
π
100 kWh β 5 MWh Β· 100 kW β 2 MW
Industrial Challenge
Nepal's industrial corridor β Birgunj, Hetauda, Butwal, Dhangadhi β loses an estimated 15β25% of productive output annually to power interruptions and voltage events. Industrial BESS from Arsa Energy β¦
NPR 1β8 crore
Typical System Cost
NPR 2β10 lakh
Monthly Savings
4β6 years
Payback Period
πΎ
5β200 kWh Β· cooperative & individual
Agricultural Challenge
Nepal's agricultural Terai runs on diesel β an expensive, polluting, and fragile fuel chain that keeps farming costs high and limits productivity. Arsa Energy designs solar irrigation microgrids and rβ¦
NPR 15β80 lakh (pre-subsidy)
Typical System Cost
30β50% of capital cost
AEPC Subsidy
NPR 1β5 lakh (per cooperative)
Monthly Diesel Savings
β‘
10 MWh β 100+ MWh Β· MW-class PCS
Utility-Scale Challenge
Nepal's hydropower-rich grid faces a fundamental paradox: monsoon surplus and dry-season deficit, with limited cross-border export capacity. Utility-scale BESS (10 MWh β 100+ MWh) enables NEA and indeβ¦
10β500 MWh
System Scale
USD 180β250/kWh (at scale)
Capital Cost
Ancillary services, arbitrage, capacity
Revenue Streams
We don't just drop off equipment. We design, engineer, commission, and support every system we build β from the first site visit to year 20 of operation.
01
Site & Load Assessment
We audit your energy consumption, grid connection quality, and infrastructure before recommending anything.
02
System Design
Our engineers size the solar array, battery, and inverter to your exact load profile, outage tolerance, and economics.
03
Supply & Installation
All equipment is sourced under the Arsa Energy brand or our Hithium partnership β installed by certified technicians.
04
Commissioning & Monitoring
Every system goes live with remote monitoring, 24/7 alerts, and performance guarantees. We stay on call.
We select Lithium-Ion (LFP) or Sodium-Ion depending on your duty cycle, climate, and lifetime cost requirements β then integrate everything under one system.
Lithium-Ion (LFP)
Hithium βPower β 5 kWh to 55 MWh
Best for residential, C&I, and long-duration utility
6,000+ cycle life β 15+ years of service
2h, 4h, and 8h duration configurations
95%+ round-trip efficiency at scale
Sodium-Ion (Na-ion)
Hithium βCell N162Ah β World First
Ideal for frequency regulation and high-cycle duty
20,000+ cycle life β lowest lifetime cost per cycle
Operates from β40Β°C to +60Β°C
No lithium, cobalt, or critical mineral dependency
Li+Na
Hybrid Systems
LFP base for endurance + Na-ion peak for millisecond-level grid response.
Whether you're a homeowner tired of outages or a utility planning grid storage β our engineers will design the right system and walk you through the economics. No obligation.